Case study · Cloud infrastructure
OpenNebula
Sunstone had no consistent structure. I designed one, and we delivered it in phases.
- Role
- Product Designer
- Team
- 1 designer, 6 developers
- Released
- July 2026
- Platform
- Web
- Scope
- Navigation + 21 resource views
Problem
21 resource types, each with its own layout. The detail panel moved between views.
What I did
12 research sessions, every resource mapped to the docs, one shared layout.
Outcome
Released July 2026 with six developers, and presented in the OpenNebula 7.4 webinar.
They asked for folders. The need was one resource in many places.
Operators file the same VM by client, by environment and by operating system, all at once. A folder tree makes them pick one. This exploration turns Sunstone's nested labels into one place to browse everything, across resource types.
- 01 · The request
“Can we have folders?”
Teams running hundreds of VMs wanted to group them the way they group files.
- 02 · The catch
A folder gives a resource one parent.
Move acme-fix-gw-01 into Production and it leaves Acme-Capital. It is never filed under its OS at all.
- 03 · The shift
Labels don't make you choose.
The same VM carries its client, its environment and its OS, at the same time.
- 04 · The hierarchy
And labels already nest.
Sunstone's label model supports parents. What was missing was one place to browse them across VMs, templates, images and networks.
- 05 · Try it
Pick a label. Open a resource.
Follow any row to every label it lives in: the picture a folder tree cannot draw.
I didn't argue for a layout.
I built both and tested them.
Should every label live in one tree, or should System, Group and Personal labels be kept apart? I built both. Same data, same permissions. Only the navigation changed.
I coded a test runner around the prototypes. It assigns a version, sets four realistic tasks, and scores each one from what the prototype actually did, not from what people said afterwards.
Separate scopes moved forward and became the design above. Everyone on that version finished every task and rated scope clarity 4 or 5 out of 5. On one tree, one participant gave up on the first task. Six people is a small sample, so I read it as direction, not proof.